DANIELI HEAVY-DUTY CRANES FOR EFFICIENT, RELIABLE EAF OPERATION

SHS Stahl Holding Saar orders cranes for two meltshops

 

SHS Stahl Holding Saar has selected Danieli Centro Cranes technology and equipment for efficient and reliable EAF operation at two meltshops in Germany.
The two, multifunction heavy-duty cranes will have a capacity of 350(590) and 350(620) tons, and will be installed at Saarstahl in Völklingen, and at Dillinger in Dillingen, respectively.
Just one crane will serve a whole meltshop for EAF scrap charging, ladle handling, molten steel transport, and EAF maintenance. They will also ensure safe handling of furnace components.
Designed according to demanding DIN EN1090 European standards, these four-girder cranes will incorporate cutting-edge automation, energy-efficient technology, and advanced safety features.
Initially operated manually, they will be equipped with functionalities for semi-automatic operation and remote control from a ground-based pulpit desk.
The two cranes will be designed and manufactured at the specialized Danieli Thailand manufacturing center, making use welding robots that ensure the highest quality standards.
Danieli cranes undergo comprehensive testing at Danieli facilities to guarantee reliability and performance, before shipment.
Cranes will be installed by Danieli and go into operation by September 2027 and April 2028, respectively.

Bahador_portrait

Direct Contact

Maysam Bahador

Share this page

Latest News

Innovative solution of DANIELI Automation with Q-Robot to mark bar steel bundles at GMH

An AI-powered image processing robot attaches fully automated labels with tying wires to bar steel bundles without using any welding process

EXCELLENT AND CLEAN REHEATING PERFORMANCE WITH PATENTED HYDROMAB BURNERS

Danieli walking-beam furnace in operation at Stahlwerk Annahütte

ThyssenKrupp Steel Europe launches four major projects for the steel production of the future with the support of Danieli

At thyssenkrupp Steel Europe (TKSE), the modernization of four large plant complexes at the Bruckhausen site is beginning. On 20.11.2023, we from DANIELI Germany took part in the laying of the foundation stone for the “Strategy 2030” project in the presence of Mona Neubaur, NRW Minister of Economic Affairs. According to TKSE, it is investing […]

Riva Group modernizes their four-strand wire rod mill

Again, Riva Group trusted DANIELI technologies for its long-product rolling mills in Europe. The latest and most recent intervention for Riva Group is the modernization of the four-strand wirerod mill at Riva BES – Brandenburger Elektrostahlwerke, Germany, through the supply and installation of four laying heads and pinch rolls, supplied at one time. The upgraded […]

These and all latest news of the DANIELI Group can be found here!